Minimize unplanned downtime and enhance equipment productivity.
Comprehensive stamping machine inspection service in PRESTEC

Regular press maintenance and inspections, prior to break-downs will save you from unexpected breakdowns and costs.
PRESTEC can design a press maintenance and ongoing inspection program on most types of stamping machines from different manufacturers. That will decrease downtime, enhance output, and establish a documented system for maintaining press integrity.

Inspection items in the periodic inspection program of PRESTEC

The PRESTEC press maintenance and inspection team can perform basic inspections to evaluate overall press condition to complete press evaluations covering electrical, mechanical and safety fuctionality. The following items are a typical part of this evaluation press inspection process:

  • Foundation (cracks, wear, press movement)
  • Frame (cracks, level, secure components)
  • Bushing and lift clearances
  • Bushing clearance
  • Upper and lower connections
  • Slide clearance
  • Gears
  • Drive shaft operation
  • Pneumatic system settings
  • Electrical controls
  • Lubrication system functionality
  • Bolster alignment and security
blank

Following the press assessment, the PRESTEC maintenance and inspection team will recommend modifications, updates and improvements. These recommendations will prioritize the maintenance program work. Preventive maintenance is not a single event, but an ongoing process.

Periodic Inspection Procedures For Stamping Machines At PRESTEC
1

Receiving Inquiry From Customers

PRESTEC receives information from customers, confirms information, quotes and signs periodic inspection contracts.
2

Schedule Inspections

After signing the contract, PRESTEC will work with the customer to schedule an inspection at the factory and prepare the necessary equipment for work more convenient and save time.
3

Proceed to Inspection

According to the arranged schedule, PRESTEC staff will conduct machine inspection as required. All inspection information will be stored and reported after the work is completed.
4

Report

After finishing the inspection process, PRESTEC staff will make a report on the machine's condition to customers, and at the same time suggest suitable solutions for cases that need maintenance - repair.
5

After Inspection

PRESTEC will agree with the customer and start planning to deal with the problems discovered in the periodic inspection report. The customer will decide according to the need based on the periodic inspection report.